How long does it take to build a tank?

Depending on size, it can take anywhere from 3 days for a small rectangular tank to 12 weeks for a canopy tank including pipework.   Lead times are negotiable and are dependent upon our suppliers and current workshop loadings at the time of receipt of approved drawings.



Recent Projects

Vertical Tank Installation for Bendigo

The client scope was to supply 1 x 90,000 litre and 3 x 70,000 litre vertical waste oil tanks and at the same time achieve a requirement for the bund size to be kept to a minimum; yet still comply with AS1940.